Customers
  Download
   
  2017
  2016
  2015
  2014
  2013
  2012
  2011
  2010
  2009
  2008
  2007
  2006
  2005
  2004
  2003 & earlier
 
 


   

Inmagusa, S.A. de C.V.
Castaños, Coah.
2007 y 2006

  • Anual maintenance as follows:
    • 4000 tons Danly stamping press.
    • Whitney 4400 cutting machine.
   
 
 

Indiana Tube de México, S.A. de C.V.
Ramos Arizpe, Coah.

  • Unload and installation of Folder press, utilities included.
 
 
 

Windsor & Associates Internacional, S.A. de C.V.
Nuevo Laredo, Tamps.

  • Disconnection, disassembling, wood supply for exportation, load in the trailers of machining complete line in Automotive Components Holding, LLC.

León, Guanajuato

  • Unload, set in site, align and leveling of 6 machining stations CVST plant.
 
 
 

MPI Internacional, Inc.
Querétaro, Qro.

  • Civil works (pit) for press.
  • Teardown of PTC 1500 tons press in Michigan, USA.
  • Transportation from Michigan, USA to Querétaro, Qro.
  • Unload and complete installation of PTC 1500 tons press.
 
 
 

Red Boxes Systems de México, S.A. de C.V.
Querétaro ,Qro.

  • 800 tons Blow press installation.

Silao, Gto.

  • Ajax 1300 tons forge press installation, in American Axle facilities.
  • Relocation of rectifier machine and work tables, in American Axle facilities.
  • Relocation Welabrador granules machine, in American Axle facilities.
 
 
 

Phoenix Machinery Movers, Inc.
Matamoros, Tamps.

  • (2) 1000tons injection presses, in Therma Tru Corporation Puertas y Vidrios, SA facilities.

San José Iturbide, Gto.

  • (1) 300tons injection press in Catalina facilities.

Toluca, Estado de México.

  • Provision of personnel to CNC machine installation with graphite table.
 
 
 

Mega Empack, S.A. de C.V.
Querétaro, Qro.

  • Unload, set at place, align and leveling of (2) injection cell, as well as fabrication of structure for mezanine, electrical substation, eléctrical power drops, air and water drops, for new Crispura and Colgate lines.
 
 
 

Contracting México IICC, S. de R.L. de C.V.
Ramos Arizpe, Coah.

  • Teardown of existing equipment and unload, unpacking, move final site, installation of new Alfing equipment station #10, Chrysler Engine plant.

San Luís Potosí, SLP.

  • Provision of personnel and supervisión to machinery and equipment installation, new body shop plant, GMT-225 project, 2 shift, 12 hours x shift, per 8 weeks. General Motors de México facility.
  • Provision of personnel and supervisión to MANN-HUMMEL filtration system equipment installation, BP-100 project in new Transmission plant. General Motors of México facility.
  • Material supply, provision of personnel and supervision to steel structure fabrication as supports to coolant pipe main headers and other services. BP-100 project, in new Transmission plant. General Motors of México facility.
  • Material supply, provision of personnel and supervision to steel structure fabrication to load assistance (cranes), plenum mist collector and andon board. BP-200 project, in new transmission plant. General Motors of México facility.
  • Provision of supervisión to machinery installation, BP-200 project in new transmission plant. General Motors of México facility.
 
 
 

KMJ Machinery Movers, Inc.
Ramos Arizpe, Coah.

  • 2000 tons Danly stamping press installation, in Martínrea facilities.
 
 
 

Centennial Technology, Inc.
Toluca, Edo. de México.

  • Provision of mechanical and electrical personnel to assembly and installation of differents parts of injection presses. In Intier Automotive, S.A. Magna group.
 
 
 

Ube Machinery, Inc.
Toluca, Edo. de México.

  • (1)3300 tons, (3)1100 tons, (1)750 tons, (2)2200 tons UBE injection presses installation, in Intier Automotive, S.A. Magna group.

Aguascalientes,Ags.

  • Provision of personnel to repair 850 ton injection press Calsonic plant.

Zacatecas,Zac.

  • Provision of personnel to repair 1200 tons injection press.
 
 
 

O-I México, S. de R.L. de C.V.
Tlajomulco de Zúñiga, Jal.

  • Material supply, fabrication and installation of Mezanine.
  • Machinery and equipment installation.
  • Supply and installation of main header pipes and drops each equipment, as well as civil works.
  • Supply and installation of cable tray and wires from electrical substation to main panel. As well as from main panel to each equiment.
 
 
 

Rapid Plastic de México, S. de R.L. de C.V.
Ramos Arizpe, Coah.

  • Disassembling and load in the trailer, several equipment.
 
 
 

Cinetic Automation, Inc.
Reynosa, Tamps.

  • Complete installation of compressor assembly líne, in Emerson facilities.
 
 
 
   
F&T Industrial Contractor, S. de R.L. de C.V.