F & T Industrial

INSTALLING THE PROGRESS IN MEXICO AND THE WORLD

Rigging, installation & plant relocation experts

CONTACT US

2012

Projects

Nissan Mexicana, S.A. de C.V.

Aguascalientes, Aguascalientes.

  • Preparation areas for new models QRK2 y HR-1, Engine Plant.
  • Equipment installation for new camshaft line QRK-2, engine plant 2.

Cuernavaca, Morelos.

  • Installation of automatic cell Roller HEM door´s for model L02B y X11M, body shope plant.
  • Installation of sub assemblies and welding equipment for model L02B y X11M, body shope plant.
GSN Maquinaria, Servicios CNC, S.A. de C.V.

Ciénega de Flores, Nuevo León.

  • Technical support and several equipment installation inside of facility NGK Ceramic, S.A. de C.V.
Getrag Transmission Manufacturing de México, S.A. de C.V.

Irapuato, Guanajuato.

  • Machinery and equipment relocation for preparation of the second assembly line.
  • Matarials supply, labor and equipment for the installation of heads and services such as compressed air, water, electricity machines, for the second assembly line.
TyssenKrupp System Engineering, GmbH

Irapuato, Guanajuato.

  • Mechanical and electrical installation for mainline.
  • Mechanical and electrical installation for pre-assembly line.
  • Mechanical and electrical installation for testing bench.
  • Mechanical and electrical installation for testing lines.
  • Work performed in 2nd transmission assembly line, Getrag Transmission Manufacturing de Mexico, S.A. de C.V.
  • Unload, unpacking and complete installation of: Testing bench of operation 40.9 & 50.9.
Kuka System de México, S. de R.L. de C.V.

Saltillo, Coahuila.

  • Technical support and several equipment installation in body shope plant, DUCATO project, inside of Chrysler de Mexico.
Metokote de México, S. de R.L. de C.V.

Querétaro, Querétaro.

  • Technical support and equipment installation of a complete line of electrophoretic paint.
  • Technical support and equipment to relocate a complete line of powder paint from San Luis Potosi to Queretaro plant.
Durr México, S.A. de C.V.

Saltillo, Coahuila.

  • Fabrication and installation of metallic structure for several platforms. Aprox 600 tons.
  • Installation of (6) sets of miscellaneous booth.
  • Installation of (2) ventilation systems BV-1 y BV-2.
  • Fabrication and assembly of chimney for mixtures room.
  • Provision of personnel and equipment for administration. Aprox. 120 people.
  • Activities in new paint plant, DUCATO project, Chrysler de Mexico.
Windsor & Associates International, S.A. de C.V.

Aguascalientes, Aguascalientes.

  • Unload and installation of one under drive stamping press 2000 ton in Gstamp plant.

Puebla, Puebla.

  • Unload and installation of one under drive stamping press 1000 ton in Gstamp plant.

Toluca, Estado de México.

  • Unloading and installation of one blowing press.

Nuevo Laredo, Tamaulipas.

  • Unload and installation of several equipment and stamping presses in Rheem plant.
Liberty Steel Products, Inc.

Saltillo, Coahuila.

  • Unload and installation of one stamping press 1000 ton.
Red Boxes Services

Silao, Guanajuato.

  • Unload and installation of two forging presses (1) 2000 ton and (1) 2500 ton, inside of American Axle plant.
Hirotec México, S.A. de C.V.

Puebla, Puebla.

  • Relocation of three (3) Hemming presses of 300 ton each inside of Silao Guanajuato facility.
  • Relocation of two (2) Hemming presses of 250 ton each from Ramos Arizpe Coahuila to Silao Guanajuato plant.
Phoenix Machinery Movers, Inc.

Puebla, Puebla.

  • Relocation of one laser cell from Faurecia plant to new facility.

Ramos Arizpe, Coahuila.

  • Disconnection, disassembly, packaging and placement in transport of various lines of ZF Sach’s plant machinery.
Cambridge Riggers, Ltd.

Tlalnepantla, Estado de México.

  • Relocation of (2) 650-ton stamping presses from Tlalnepantla to Ramos Arizpe.

Gallery

Asset-50-gigapixel-scale-4_00x.png
Asset-51-gigapixel-scale-4_00x.png
Asset-53-gigapixel-scale-4_00x.png
Asset-52-gigapixel-scale-4_00x.png
Asset-54-gigapixel-scale-4_00x.png

Office Locations

mapa

Main Office

Prol. Irlanda # 711.
Priv. de Luxemburgo
Saltillo, Coahuila, México.
C.P. 25240

Tel: +52 (844) 415 2011 Tel: +52 (844) 415 2008

proyectos-corporativo@ftindustrial.com.mx

Branch Office

C. Coleadero #130.