Projects
Silao, Guanajuato.
- Unload and installation of (16) sixteen CNC (Computer Numerical Control) (12) SW & (4) Weisser.
Saltillo, Coahuila.
- Load on trucks and transportation for Lazer machine.
- Unload and installation of equipment.
- Aligment, leveling and anchor equipment.
Querétaro, Querétaro.
- Relocation a line of the fibro cement within the same Metecno facility included disconnecting and reconnecting electrical, pneumatic and mechanical.
Reynosa, Tamaulipas.
- Receipt of machinery and equipment.
- Unload and installation of 26´pin expander and 3500 lbs press.
- Aligment, leveling and anchor equipment.
Saltillo, Coahuila.
- Receipt of machinery and equipment.
- Unload and installation of one Cutting Lazer Machine.
- Aligment, leveling and anchor equipment.
Ramos Arizpe, Coahuila.
- Supply of skilled labor, equipment and materials to fabricate (2) dress pack left and right according with the drawings provided by customer; as well as one set of safety guards.
- Supply of skilled labor to disassembly and reassembly for accesories in robot area.
Querétaro, Queretaro.
- Civil work: Design and construction of a Pit for the 500 ton Eagle Press.
- Mechanic work: Unload and installation of (1) 500 ton Eagle Press and (2) 250 ton Verson Press and electrical interconnection.
- Millwright: Design and construction of the Steel Pit Cover for the 500 ton Eagle Press as well as the scrap Shute construction.
- Design and construction of a structural mezzanine and cement slab.
INSTALLING THE PROGRESS IN MEXICO AND THE WORLD
Rigging, installation & plant relocation experts