Projects
Apaseo El Grande, Guanajuato.
- Set 1600 tons Komatsu Tryout Stamping press & commissioning.
- Set SNK Milling machine installation & commissionig.
- Both projects in new Toyota facilities plant.
Apaseo El Grande, Guanajuato.
- Set TIM Injection molding machine installation, bomper line.
- Set Package No. 8, Tooling installation final assembly line.
- Both projects in new Toyotafacilities plant.
Apaseo El Grande, Guanajuato.
- Colored line mechanical installation, Final Assembly line.
- Colored & Trim line electrical installation, Final Assembly line.
- Bomper line mechanical & electrical installation.
- Door line mechanical & electrical installation.
- All projects in new Toyota facilities plant.
Derramadero, Coahuila.
- Set 3500 tons Engle Injection press tear down Supervision in Kendall, Indiana and installation CVG new building. Complete paint machine included.
- Set 3500 tons HPM Injection press tear down SV in Kendall, Indiana and installation CVG new building. Complete paint machine included.
Derramadero, Coahuila.
- Utilities installation new injectionbuilding.
- Electrical 480 VCA & 220 VCA installation.
- Compressed air piping main header and drops.
- Cooling tower wáter main header and drops.
- Steel structure mezzanine fabrication and installation.
- Injection molding machines relocation from plant #2 to new building.
- (1) Set 3500 tons, (1) set 2200 tons, (1) set 1430 tons.
- Set 725 tons, (1) set 500 tons, set 250 tons.
- 3D equipment relocation from plant #2 to new building, main electrical and air compressed drops included.
San Luis Potosí, San Luis Potosí.
- Tear down of Jenoptik Votana 185 lasser cell in San Luis Potosi plant.
- Transport of complete machine.
- Installation of Jenoptik Votana 185.
Aguascalientes, Aguascalientes.
- Overhauling UBE 2500 Tons Die casting press, Aluminium plant Complex A1.
- Summer shot down to Teardown (2) HEMI presses and peripheral equipment, Body shop Complex A1.
- Overhauling TOSHIBA AQM-057 Die casting press, Aluminium plant, Complex A1.
- Electrical Overhauling line #6, Stamping Complex A1.
- Mechanical & Electrical Overhauling line #10, Stamping plant Complex A1.
- Ladder Frame ZV9 new machinery line installation, electrical, air compressed and coolant drops included, Engine 1, plant Complex A1.
- Overhauling AQM-091 Die casting press, Aluminium plant.
- ASL line PR25 new machinery installation, electrical, air compressed drops included, Aluminium plant Complex A1.
- Installation of (3) new machinery lines, (29) machines for Camshaft, (95) machines for Cylinder Block & (88) machines for Cylinder Head, all utilities drops included, supply and installation of 4000A substation, distribution panels and drops. Engine plant #1 & #2, Complex A1.
CIVAC, Mor.
- Christmas shotdown Overhauling UBE 2500 Tons Die casting press, Aluminium plant.
Aguascalientes, Aguascalientes.
- Frontal camera installation line 1, 2 &3 Final Assembly line, Nissan Mexicana Complex A1.
- Frontal camera installation line 1, Final Assembly line, Nissan Mexicana Complex A2.
- Small projects throughout the year Nissan Mexicana A1&A2, Jatco I&II.
Piedras Negras, Coahuila.
- Fans, ducting and fitting installation Reversal system for new oven No. 5.
- EMHART Machine installation for new oven No. 5.
Querétaro, Querétaro.
- Eagle 800 Tons stamping press installation.
Derramadero, Coahuila.
- Fabrication and installation of Steel structure for chimeny platform and differents areas.