Cuernavaca, Morelos.
- Tear down old HFO equipment and HFO new equipment installation.
- Final assembly line.
Derramadero, Coahuila.
- Mitsubishi (1) set 250 Tons & (1) set 500 tons injection machines relocation.
- Material supplies and technical support for Electrical and pneumatic drops.
- DEMAG (1) set 1400 tons injection machine relocation.
- Material supplies and technical support for Electrical and pneumatic drops.
- Material supplies and technical support for Electrical and pneumatic drops for Haitian (1) 2600 tons & (1) 3500 tons injection presses.
- 480 Volts electrical drop to Chiller and Pump.
- Milacron (1) 725 Tons injection machines relocation.
- Material supplies and technical support for Electrical and pneumatic drops.
Derramadero, Coahuila.
- Offload, unpacking, mechanical & electrical assembly and installation for Haitian (1) 2600 tons & (1) 3500 tons injection presses.
Ramos Arizpe, Coahuila.
- C1UC ASM FRT SIDE DOOR automatic cell relocation.
- C1UC ASM RR SIDE DOOR automatic cell relocation.
- Material supplies and technical support for Electrical and pneumatic drops.
- HOOD D2UC line automatic cell relocation.
- Material supplies and technical support for Electrical and pneumatic drops.
- GMT-166 automatic cell relocation.
- Material supplies and technical support for Electrical and pneumatic drops.
Ciudad Juárez, Chihuahua.
- Different project with Technical support and tools, shotdown and weekends, works performed fifferent locations.
- Offload, unpacking, mechanical & electrical assembly and installation, Commissionning support.
- Komatsu (2) set L2M800 Stamping presses + Pit covers.
- Komatsu (3) set L2M600 Stamping presses + Pit covers.
- Fox Conn PCE Technology plant.
San Miguel Allende, Guanajuato.
- Piping supply and fittings, labor and elevation equipment for: Coolant main header plus drops to each machine, line #1.
Parque industrial FIPASI, Silao, Guanajuato.
- (1) set 250 tons & (1) set 300 tons Trim presses, internal relocation.
- Complete installation of 4000 tons Ajax forge press.
- Material supplies and installation for electrical feedings press and peripheral equipments.
- Material supplies and installation for pneumatics and hydraulic feedings press and peripheral equipments.
- Material supplies and installation for dust extraction ductwork of press and peripheral equipments.
- Complete installation of 2000 tons Verson forge press.
- Material supplies and installation for electrical feedings press and peripheral equipments.
- Material supplies and installation for pneumatics and hydraulic feedings press and peripheral equipments.
- Material supplies and installation for dust extraction ductwork of press and peripheral equipments.
- (1) set American saw #3 installation.
- (1) set American saw #4 installation.
- (1) set Nishijima saw #11 installation.
- (1) set Nishijima saw #12 installation.
- Material supplies and installation for electrical, pneumatics feedings.
- Material supplies and installation for dust extraction ductwork.
- Offloading and installation of (1) set Shot blasting machine and (1) set Dust collector unit.
- Material supplies and installation for electrical, pneumatics feedings.
- Material supplies and installation for dust extraction ductwork.
Aguascalientes, Aguascalientes.
- Techanical support, tools, manuver equipment for: Bronze ring replacement, Kurimoto 4000 tons forge press.
- San Francisco industrial park, Goshyu Mexicana plant.
- Techanical support, tools, manuver equipment for (1) set Oven tear down.
- Jatco plant, site #1.
- Technical support, tools and maneuver equipment for CASE line machines installation.
- Jatco plant, site #1.
- Technical support, tools and maneuver equipment for:.
- CBO phase #1, lot of machines installation.
- Jatco plant, site #1.
- Techanical support, tools, manuver equipment for: Planetary reducer replacement, Kurimoto 4000 tons C2P-40HWL-31 forge press.
- San Francisco industrial park, Goshyu Mexicana plant.
- Technical support, tools and maneuver equipment for:
- Line F, G#5-2 layout relocation.
- Jatco plant, site #1.
- Technical support, tools and maneuver equipment for: Project R000142639 layout relocation.
- Jatco plant, site #1.
- Technical support, tools and maneuver equipment for: Case line F, (3) set NTC Machinning center.
- Jatco plant, site #2.
Apaseo el Grande, Guanajuato.
- Offload, unpacking, mechanical & electrical assembly and installation, Commissionning support.
- (1) set Komatsu 3500 tons Stamping press.
- (1) set Komatsu 1600 tons Stamping press.
- (1) set Komatsu 1200 tons Stamping press.
- also, supply material, fabrication and installation of Pit Cover to each press.
- Toyotetsu de Mexico plant.