Projects
Aguascalientes, Aguascalientes.
- Primary infrastructure for S1, S2, S3 lines, new location
Supervision, labor and equipment
Cable tray, cables and support supply and installation
Compressed air header piping
T&CH plant, A1 Complex. - RTC H60 layout relocation
Relocation of steel structure ‘Mezzanine’
Tranformers, weld guns, electrical and pneumatic drops
Body shop plant, A1 Complex. - Primary infrastructure for new assembly transmission line
Supervision, labor and equipment
Cable tray, cables and support supply and installation
Compressed air header piping
Engine plant #1, A1 Complex. - Crankshaft MR remove obsolete machines
Supervision, labor and equipment to uninstall and move old machines destruction area
Engine plant #1, A1 Complex. - Floor Cab lines as sub-Assy EC, sub-Assy FR Floor, sub-Assy RR Floor new area installation
Steel structure supply and installation
Electrical header and drops, plus interconnection
Compressed air header and drops piping
Process equipment installation
Body shop plant, A1 Complex. - Screen guard recover and new fabrication for new area
Recover, enabled of existing screen guard, fabrication of new section of screen guard, and installation
Body shop plant, A1 Complex. - Design, fabrication and installation of new steel structure for H-rails
Rails, bridges and pneumatic hoist relocation
ALKA rails supply and installation
T&CH plant, A1 Complex. - Relocation of process equipment, tire mounting and balancing machines
Supervision, labor and equipment
Altia mounting machine, Micro-posion balancing machine plus peripheral equipment
T&CH plant, A1 Complex. - S3 line process equipment relocation
Supervision, labor and equipment of maneuver for complete line relocation
T&CH plant, A1 Complex. - GOM line complete process equipment relocation
Tear down and place on transport of process equipment CIVAC plant
Steel structure supply and installation A1 plant
Electrical header and drops, plus interconnection
Compressed air and supply/return water header and drops piping
Fans supply and installation
120V electrial drop for fans, 120V lot of receptacles
Process equipment installation
Body shop plant, A1 Complex.
Escobedo, Nuevo Leon.
- Labor and supervision for process equipment installation, MFG plant.
Nissan Mexicana, Aguascalientes, Aguascalientes.
- Technical support and equipment for E12T3200 Komatsu press line #10 crown inspection, Complex A1.
- Technical support and tools for High Speed reductor replacement, Komatsu tandem press Complex A2.
- Technical support and equipment for E12T3200 Komatsu press line #10 crown repair, Complex A1.
Escobedo, Nuevo Leon.
- Vessel unloading, transportation from Port to plant, and installation of AIDA 300 tons press.
Garcia, Nuevo Leon.
- S59 tear down and transportation of lasser machine from Monclova plant to Garcia plant.
- Transport and installation of blowing machine.
Aguascalientes, Aguascalientes.
- Labor for adding (2) valve gate circuits.
- Machine ST-3150-1 MFG: 22527.
- Machine ST-3150-2 MFG: 25721.
- Machine UF-3000 MFG: 33203.
- Boomper line, Nissan Mexicana plant Complex A1.
Galería


















INSTALLING THE PROGRESS IN MEXICO AND THE WORLD
Rigging, installation & plant relocation experts
CONTACT US