Meritor Mexicana S.A de C.V.
El Marqués, Qro.
- Structure and Bridges rehabilitation for two overhead cranes, two for 5 ton & one for 10 ton of capacity.
- Supply and installation of two hoist 5 ton & one 10 ton of capacity.
- Preventive and maintenance policy of the overhead cranes before mentioned
ThyssenKrupp Krause, S.A de C.V.
Chihuahua, Chih.
- Installation of two motors assembly lines & two engine assembly lines in Ford Motor Company
Windsor & Associates International S.A. de C.V.
Querétaro, Qro.
- Unload and Installation of “Tube mill line” in new plant Arvin Meritor.
Silao, Gto.
- Unload and Installation of equipment in Deatwyler Rubber Mexico.
Ciudad de Mexico
- Disassembly and Truck load of one Verson Press 400T in Eaton Facility.
Logikad
San Luis Potosí, S.L.P.
- Assemble of one KMC Press 800T (Korea Machinery Corp.) in Posco Facility.
Kuehne & Nagel, S.A de C.V.
Ciudad de Mexico
- Export Packing and trucks load of two lathes. Toluca, Edo. de Mexico.
- 850 tons Nagel press installation for Intier Automotive, SA of Magna group.
Inergy Automotive Systems Mexico, S.A. de C.V.
Ramos Arizpe, Coah.
- Relocation of several machines.
Mahle Componentes de Motor de Mexico, S. de R.L. de C.V.
Ramos Arizpe, Coah.
- Relocation of several machines.
Johnson Controls
Saltillo, Coah.
- Isocianato and silicón tanks farm installation, pumps, pipe and fittings supply & installation.
- 8mx10mx3m steel fabrication for mezzanie, #5 and #6 line, foam area.
- Complete process equipment installation for líne #5 y #6 foam area.
Engicom, S. de R.L. de C.V.
Ramos Arizpe, Coah.
- Offload and Installation of several equipment of the Scorpion Project.
FFT Mexico, SA de CV.
Puebla, Pue.
- Identification, disconnection, crating and load trucks of the lines GMT-166/168.
Ramos Arizpe, Coah.
- Unload, Unpacking and Installation of equipment line GMT-166/168 in Magna Stamping Facility.
Ramos Arizpe, Coah.
- Project GMRA 166/168 Lowers, body shop plant, General Motors of Mexico complex
Ramos Arizpe.
- Materials supply, manufacture and installation of structure for catwalks approximately 120 tons.
- Provision, rating and installation of pipe for water of chiller and compressed air, in catwalks. As well as interconnection of pipe of main header to catwalks.
Ramos Arizpe, Coah.
- Provision personnel and supervision, equipmet necessary to performance HHR equipment relocation shotdown, floor line, body shop plant.
San Luís Potosi,SLP.
- Materials supply, manufacture and installation of structure for mezanine, at FAURECIA EXHAUST MEXICANA, SA plant.
Phoenix Machinery Movers, Inc.
Puebla, Pue.
- Unload and Installation of one laser cell in Faurecia Facility.
Technotrim de Mexico, S. de R.L. de C.V.
Saltillo, Coah.
- Several layout relocations, as well as #3 and #4 line installation for foam area.
CCL Container, S.A. de C.V.
Cuatlitlán, Edo. Mexico.
- Disconnection and disassembling of P-8 line at Penetag, Canadá.
- Transportation from Canadá to Cuautitlan, Edo. de Mexico.
- Unload and installation P-8 line equipment at CCL Container plant.











INSTALLING THE PROGRESS IN MEXICO AND THE WORLD
Rigging, installation & plant relocation experts